Pat Lmi Manual Ds350

Manitowoc Boom Trucks
PAT LMI MANUAL - DS150 •Operator Handbook For Truck Mounted Cranes
Manitowoc Boom Trucks, Inc. 3000 S. Austin Ave Georgetown, TX 78627-1609 Sales:
(512) 942-3000
Sales Fax:
(512) 863-3776
Service:
(512) 942-3000
Service Fax:
(512) 942-3094
Web Site: www.manitowocbt.com
7600004-001A
A
Company
December 2001
FORWARD The purpose of this manual is to provide the customer with the operating procedures essential for the promotion of safe and proper machine operation for its intended purpose. It is important to over-stress proper usage. All information in this manual should be READ and UNDERSTOOD before any attempt is made to operate the machine. SINCE THE MANUFACTURER HAS NO DIRECT CONTROL OVER MACHINE APPLICATION AND OPERATION, CONFORMANCE WITH GOOD SAFETY PRACTICE IN THIS AREA IS THE RESPONSIBILITY OF THE USER AND HIS OPERATING PERSONNEL. ALL PROCEDURES HEREIN ARE BASED ON THE USE OF THE MACHINE UNDER PROPER OPERATING CONDITIONS, WITH NO DEVIATIONS FROM THE ORIGINAL DESIGN. ALTERATION AND/OR MODIFICATION OF THE MACHINE IS STRICTLY FORBIDDEN WITHOUT WRITTEN APPROVAL FROM MANITOWOC BOOM TRUCKS, INC. REMEMBER, EQUIPMENT IS ONLY AS SAFE AS THOSE WHO OPERATE IT!
A
Company
PAT America, Inc.
www.patamerica.com
LOAD MOMENT INDICATOR DS 150 for Truck Mounted Cranes
OPERATOR'S MANUAL PAT 031-300-101-046, Rev. A, 12/10/2001
Operator's Manual
DS150
NOTICE PAT America, Inc. makes no warranty of any kind with regard to this material, including, but not limited to, the implied warranties of merchantability and/or its fitness for a particular purpose. PAT America, Inc. will not be liable for errors contained in this manual or for incidental or consequential damages in connection with the furnishing, performance, or use of this manual. This document contains proprietary information, which is protected by copyright, and all rights are reserved. No part of this document may be photocopied, reproduced, or translated to another language without the prior written consent of PAT America, Inc. PAT America, Inc. reserves proprietary rights to all drawings, photos and the data contained therein. The drawings, photos and data are confidential and cannot be used or reproduced without the written consent of PAT America, Inc. The drawings and/or photos are subject to technical modification without prior notice. All information in this document is subject to change without notice.
MANUAL REVISIONS REV A
DATE 12/10/01
NAME CSH
DESCRIPTION Correct picture pg15, add zeroing force transducer note, and minor text errors
© 1999 PAT GmbH, D-76275 Ettlingen / Germany
© PAT Rev. A 12/10/01 // CSH
© 2000 PAT America, Chambersburg, PA 17201, USA
101046_A.DOC
Operator's Manual
DS150
TABLE OF CONTENTS 1
GENERAL INFORMATION ............................................... 1
2
WARNINGS ........................................................... 1
3
SYSTEM DESCRIPTION ................................................. 2
4
SYSTEM COMPONENTS................................................4 4.1 CONSOLE OPERATION ..................................................... 4 4.1.1 Load Moment Display.................................................... 4 4.1.2 Operating Mode Selector ................................................. 5 4.1.3 Reeving And Man-Basket Selection Switch.................................... 5 4.1.4 Console Power Indicator .................................................. 5 4.2 CONTROL LOCKOUT OVERRIDE KEY SWITCH (OPTIONAL) ....................... 6
5
PRE-OPERATION INSPECTION AND CALIBRATION VERIFICATION ............. 7
6
SERVICE AND MAINTENANCE ........................................... 8
7
TROUBLESHOOTING ................................................... 9
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
1
General Information
1
GENERAL INFORMATION
The PAT DS 150 Load Moment Indicator (LMI) complements the operator's skill by providing the information needed to make the demanding lifts required of modem cranes and displaying it in the operator's cab. Using various sensing devices, the LMI monitors all crane functions and provides the operator with a continuous reading of the crane's rated capacity. The readings continuously change as the crane moves through the motions needed to make the lift. If hazardous conditions are approached, the LMI is designed to warn the operator by sounding an audible alarm and illuminating a warning light. The LMI also provides the operator with information concerning certain geometrical data such as main boom length corresponding to the selected operating code, main boom angle, jib angle, jib length, operating mode and weight of the load on the hook, and the total weight being lifted by the crane.
2
WARNINGS
The LMI is an operational aid that warns a crane operator of approaching overload conditions and over hoist conditions that could cause damage to equipment and personnel. The device is not, and shall not, be a substitute for good operator judgment, experience and use of accepted safe crane operating procedures. The responsibility for the safe crane operation shall remain with the crane operator who shall ensure that all warnings and instructions supplied are fully understood and observed. Prior to operating the crane, the operator must carefully and thoroughly read and understand the information in this manual to ensure that he knows the operation and limitations of indicator and crane. Proper functioning depends upon proper daily inspection and observance of the operating instructions set forth in this manual. Refer to Section 6. Pre-Operation Inspection and Calibration Verification of this handbook.
The LMI can only work correctly, if all adjustments have been properly set. For correct adjustment, the operator has to answer thoroughly and correctly all questions asked during the setup procedure in accordance with the real rigging state of the crane. To prevent material damage and serious or even fatal accidents, the correct adjustment of the LMI has to be ensured before starting the crane operation.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
2
3
Operator's Manual
DS150
SYSTEM DESCRIPTION
Fig. 1: Components of the LMI System PAT DS 350 1. Operator’s Console 2. Central Unit 3. Pressure Transducer 4. Cable Reel 5. Boom Tip Junction Box 6. A2B Switch
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
System Description
3
The PAT DS 150 Load Moment Indicator (LMI) System consists of a central microprocessor unit, operator consoles, length/angle sensor, pressure transducers and an anti-two-block switch. The system operates on the principle of reference/real comparison. The real value, resulting from the pressure measurement and geometric sensors, is compared with the reference data stored in the central processor memory and is evaluated in he microprocessor. An analog indication of % capacity is displayed via an operator's console. When limits are reached, an overload warning signal is generated. At the same time, the crane movements that increase load moment such as hoist down, telescope out, and boom down will be locked out. The fixed data regarding the crane, such as dimensional data, capacity charts, boom weights, and centers of gravity are stored in memory chips in the central processor unit. This data is the reference information used to calculate the operating conditions. Boom length and boom angle are registered by the length/angle sensor, located inside the cable reel, mounted on the boom. The boom length is measured by the cable reel cable, which also serves as an electrical conductor for the anti-two- block switch. The crane load is measured by pressure transducers attached to the piston and rod side of the lift cylinder. Controls on the operator's console allow the operator to select the operating mode (main boom, jib, etc.) as well as the parts of the line currently in use. The system will then limit operation to the capacities on the selected load chart, or the maximum permissible line pull in that configuration. After the engine is started and the PTO is engaged, the LMI powers up and conducts an automatic test of the complete system. After two successful system tests without errors, the system is ready for operation. In case of a system error, both the overload and anti-two-block lights on the central unit will illuminate. The interactive user guidance considerably simplifies the input of operating modes as well as the setting of geometry limit values.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
4
4 4.1
Operator's Manual
DS150
SYSTEM COMPONENTS CONSOLE OPERATION
The PAT DS 150 Load Moment Indicator (LMI) system utilizes a system console at each operator’s station. The purpose of this console is to display relative load moment data to the operator and allow the operator to input specific data concerning the configuration of the crane. The console (Figure 3) has four basic components:
Figure 2. DS150 Operator’s Console
4.1.1 Load Moment Display This is an analog indication of relative load moment. It is displayed in terms of % capacity at the given configuration and position of the boom. The meter is broken into three areas: the green bank is 0 to 90% capacity; the yellow band if 90 to 100% Capacity; and the red band is overload.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
System Components
5
4.1.2 Operating Mode Selector This switch allows the operator to select the current crane configuration. The four positions translate as follows: Pos. 1 - Main Boom Only Pos. 2 - Fixed Jib Pos. 3 - Telescopic Jib Retracted Pos. 4 - Telescopic Jib Extended By selecting the appropriate configuration, the LMI system can utilize the proper load chart for establishing machine capacity.
4.1.3 Reeving And Man-Basket Selection Switch This selector switch allows the operator to input the reeving (parts of line) or man-basket configuration being utilized. The importance of this data is to allow the system to monitor line pull capacity relative to the crane load for each of the reeving configurations available. The man-basket position changes the operating mode of the crane to a load chart that is in conformance with the requirements of ANSI A92.9-1979 for aerial devices. Reeving selections: When the crane load exceeds the maximum line pull capacity based on the parts of line selected, the system will alert the operator by activating the audible alarm, and crane functions will shut down on units equipped with the overload “shut-off” option. Man-Basket selection: When the man-basket load exceeds the maximum capacity of the operating mode the system will alert the operator by activating the audible alarm and crane functions will shut down on units equipped with the overload “shut-off” option. 4.1.4 Console Power Indicator This “button” indicator allows the operator to select which console is functional. When starting crane operation, the operator determines whether the console at his station is functional by the illumination of this button”. If the “button” is not illuminated, the operator then depresses the “button” which will switch control to the console at his location. When the console is powered, the analog meter will display % capacity, and all switch positions selected will be functional.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
6
Operator's Manual
4.2
DS150
CONTROL LOCKOUT OVERRIDE KEY SWITCH (OPTIONAL) A key-actuated switch, installed on the service console, enables the operator to 'override the control lockout feature for the load/moment circuits. The switch is spring-loaded to return from the 'in or override' position to the 'out or normal' position after it is released. In the override (in) position, the key cannot be removed. NOTE: This option does not affect the A2B control lockout circuit.
Since this switch deactivates the lockout function of the LMI system, the following instructions MUST be adhered to: The bypass switch must be used with discretion, as unwarranted use to override the Control Lockout System can result in damage to the crane and property and Injury to personnel NEVER use the by-pass switch to either overload or operate the crane in a 'not permissible range.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
Pre-Operation Inspection And Calibration Verification
5
7
PRE-OPERATION INSPECTION AND CALIBRATION VERIFICATION
Before operating the crane, perform the following Pre-Operation Inspection and Calibration Verification 1. Check the electrical wiring connecting the various parts of the system for physical damage. 2. Check the anti two-block switches and weights for free movement. 3.
The following tests shall be performed with care to prevent damage to the machine or injury to personnel. Proper functioning of the system requires successful completion of these tests before operating the machine. If the operator cannot see the load-handling device approaching the boom nose, he shall have an assistant (signal person) watch the load-handling device. The operator shall be prepared to stop the machine immediately should the LMI system not function properly as indicated by lighting the red warning light (4), sounding the audible alarm (12) and locking the crane movements, hoist up, telescope out and boom down. 3. Check the anti two-block alarm light (4) and the audible alarm (12) by performing one of the following tests: a. By manually lifting the weight attached to the anti two-block switches. When the weight is lifted, the audible alarm (12) should sound, the anti two-block alarm light (4) should light. b. Slowly raise the main boom load-handling device to create a potential two-block condition. When the load-handling device lifts the weight, the audible alarm (12) should sound, the anti two- block alarm light (4) should light and the motion of the load-handling device should be stopped. Lower the load-handling device slightly to eliminate this condition. c. Slowly lower the boom to create a potential two-block condition. When the load-handling device lifts the weight, the audible alarm (17) should sound, the anti two-block alarm light (24) should light and the boom lowering function should be stopped. Lower the load-handling device slightly to eliminate this condition.
If the light and audible alarm do not function as described and the crane movements are not stopped, the system is not working properly. The malfunction shall be corrected before operating the crane. 4. If the crane is equipped with a boom extension, repeat the test procedure for the boom extension anti two-block switch. 5. Check that the display of the main boom angle agrees with the actual boom angles. 6. Check that the display of the operating radius of the crane agrees with the actual radius. 7. Check the load display by lifting a load of known weight.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
8
6
Operator's Manual
DS150
SERVICE AND MAINTENANCE
Maintenance of the PAT DS 150 Load Moment Indicator System consists of inspecting: 1. The cabling connecting the various parts of the system. If a cable is damaged, it must be replaced immediately. 2. The insulation of the length sensor cable and the cable guides. If the insulation is worn or the cable damaged, these parts must be replaced. 3. Check the anti-two-block limit switches for freedom of movement 4. The cable reel must be properly tensioned to operate properly. 5. Check the pressure transducers at the lift cylinder and the connecting hoses for oil leakage. Other than correcting the problems identified in the Malfunctions Table (refer to next section) and replacing faulty mechanical parts and cables, no other repairs are to be performed by operating personnel. All other repairs must be performed by PAT Authorized Service Representatives.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
Troubleshooting
7
9
TROUBLESHOOTING
The service console displays 16 variables to assist the setup and diagnostics of this system. The first numeral displayed is the reference number I thru 16. The second value displayed is as follows: REF # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
VALUE Main Boom Length Main Boom Angle Radius Jib Angle (with jib only, otherwise blank) Tip Height Operating Mode Error Code (in case of error only, otherwise blank) Real Moment Jib Length (with jibs only, otherwise blank) Rated Load (in t or 1,000 lbs) Actual Load (in t or 1,000 lbs) Reeving Load Moment in % Piston side Pressure in mV Rod side Pressure in mV Test
By depressing either the page up or page down' button, the display will sequence through the variables. In case of a malfunction of the system, both the OVL and A2B lights will illuminate simultaneously. By selecting variable #7 on the service console, the display will indicate a code, which identifies the system malfunction. The error codes listed in the Malfunction Table will identify various faults, which can occur with the LMI. Following the Malfunction Table is information, which explains each fault and describes the action, which should be taken to correct the fault. Error codes 7 through 99 are faults within the electronic microprocessor and must be repaired by factory-trained service personnel. When these faults occur, an authorized PAT service organization must be contacted.
© PAT Rev. A 12/10/01 // CSH
101046_A.DOC
10
Operator's Manual
DS150
Malfunction Table Error Code Error E01
Fallen below the radius or above angle range
E02
Radius range exceeded or fallen below angle range
E03
Boom position is out of the permissible working area
E04
Operating mode not existing
E05
Prohibited length range
E06
Radius range exceeded
NOTE: If there is any Error Code displayed on the console, which is not listed in the Malfunctions Table, you shall call the Local Distributor.
Operating Errors Malfunctions in the system, which are caused by, range exceeding or operating errors by the crane operator himself are indicated on the display together with an explanation. Error codes E01, E02, E03, E04, (E05), can normally be eliminated by the crane operator himself. Error Code E01
E02
E03
E04
E05
Cause
Elimination
Fallen below the minimum radius or above the angle given in the load capacity chart due to luffing up the boom too far. The maximum radius or minimum angle given in the load capacity chart was exceeded due to luffing down the boom too far. Boom position is out of the permissible working area (over front).
Boom down to a radius or angle given in the load capacity chart.
Operating mode switch in the console incorrectly set. Operating mode is not permissible with the actual crane configuration, boom position or area definition. Boom was telescoped too far or not far enough, you may only operate up to a certain maximum or minimum boom length or with load curves for boom extension where you have to telescope the main boom to a certain length. Length sensor adjustment changed i.e. length sensor cable slid off the length sensor drum.
© PAT Rev. A 12/10/01 // CSH
Boom up to a radius or angle given in the load capacity chart. Move boom back to the permissible working area. See lifting diagram in the load capacity charts. Not applicable for Manitex Truck mounted cranes Correctly set operating mode switch to the code assigned to the operating mode of the crane. Be sure crane is set up according to proper operating configurations. Telescope boom to correct length, given in the load capacity chart.
For elimination refer to service manual.
101046_A.DOC

Load moment indicator PAT DS150 spare parts. Monitor with all parts from the LCD display to the single light of the buttons. Manuals; Home / LOAD MOMENT INDICATOR / PAT DS350 SPARE PARTS / PAT DS350 SPARE PARTS. PAT DS350 SPARE PARTS. Load moment indicator PAT DS150 spare parts. Monitor with all parts from the LCD display to the single.

Download drama the best hit kordramas. Sinopsis: Selamat pagi guys pada kesempatan kali ini mimin Download Drama Korea Terbaru 2017 akan updet drama2 korea terbaru untuk pengunjung setia blog ini, drama yang berjudul The Best Hit, Childhood friends Ji Hoon and Woo Seung are preparatory students for the civil service exam, although Ji Hoon has a secret dream to be Read More ».

Pat ds 380Pat ds 350 display

truck

S-Mod
Joined
Messages
3,108
Likes
455

Hirschmann PAT Full Set Operator & Service Manual DVD

If you download this document, you will be lost 1000 Gallons
Download Now
Hirschmann PAT Full Set Operator & Service Manual DVD
Size: 371 Mb
Language: English
Type: pdf
Pass: After download send to email to get pass 'autorepairmanuals.ws@gmail.com'

Models List:
Hirschmann PAT DS350 Manuals
Hirschmann PAT EI65 Manuals
PAT Hirschmann DS50 (DS-50) Manuals
PAT Hirschmann DS85 Manuals
PAT Hirschmann DS150 Manuals
PAT Hirschmann DS160 Manuals
PAT Hirschmann iFlex TRS 05 Manuals
PAT Hirschmann iScout IFLEX 2 Manuals
PAT Hirschmann iVisor Maestro Manuals
PAT Hirschmann iVISOR MK4E2
PAT Hirschmann PRS 80 EZ Manuals
Grove iFLEX5 PAT Load Moment Indicator Operator Manual
Grove iFLEX5 PAT Load Moment Indicator Service Manual
Grove iVISOR mentor QVGA User Manual
Grove P.A.T-L.M.I Level II System Manual
Grove PAT - LMI System Manual - Level 1 - Manitowoc Crane Care Traning
Grove PAT CM20 DS350 LMI Troubleshooting Manual
Grove PAT CM20 Electrical Diagram
Grove PAT CM20 LMI System Parts and Installation Manual
Grove PAT DS105 Operation Zone System Operator Manual
Grove PAT DS105 Operation Zone System Troubleshooting Manual
Grove PAT DS350 M8652 Troubleshooting Manual
Grove PAT DS350 M8702 Troubleshooting Manual
Grove PAT DS350MT M91001 Troubleshooting Manual
Grove PAT DS1201 Troubleshooting Manual
Grove PAT Load Moment Indicator 1351 Horizontal Console Operator Manual
Grove PAT Load Moment Indicator DS 350 G Operator Manual
Grove PAT Load Moment Indicator DS 350GW Operator Manual
Grove PAT Load Moment Indicator DS150 For Boom Operator Manual
Grove PAT Load Moment Indicator DS150 Operator Manual
Grove PAT Load Moment Indicator DS150C Operator Manual
Grove PAT Load Moment Indicator DS160 Operator Manual
Grove PAT Load Moment Indicator DS160 Service Manual
Grove PAT Load Moment Indicator DS350 AM CM20 Operator Manual
Grove PAT Load Moment Indicator DS350 Operator Manual
Grove PAT Load Moment Indicator DS350,0038 Operator Manual
Grove PAT Load Moment Indicator DS350,1307 Operator Manual
Grove PAT Load Moment Indicator DS350,1318 Operator Manual
Grove PAT Load Moment Indicator DS350,1319 Operator Manual
Grove PAT Load Moment Indicator DS350,1328 Operator Manual
Grove PAT Load Moment Indicator DS350G BCS Service Manual
Grove PAT Load Moment Indicator DS350G,GW Service Manual
Grove PAT Load Moment Indicator DS350GM Service Manual
Grove PAT Load Moment Indicator iFLEX5 Operator Manual
Grove PAT Load Moment Indicator mentor Operator Manual
Grove PAT Load Moment Indicator mentor Service Manual
Grove PAT Load Moment Indicator TM9150 Operator Manual
Grove PAT Rated Capacity Limiter System DS350
Hirschmann HC3901 Operation Manual for crane ZCC1100H_20140804
Hirschmann HC4900 Operation Manual 4 section boom_20140715
Hirschmann HC4900 Operation Manual 5-section boom_20140818
Hirschmann iFlex Operation Manual QUY260_20140702
Hirschmann PAT DS350 Manuals
Hirschmann PAT EI65 Manuals
Hirschmann PAT PRS 40 EZ Operator, Service Manual
Hirschmann PAT PRS 80 Operator, Service Manual
PAT Hirschmann DS50 (DS-50) Manuals
PAT Hirschmann DS85 Manuals
PAT Hirschmann DS150 Manuals
PAT Hirschmann DS160 Manuals
PAT Hirschmann iFlex TRS 05 Manuals
PAT Hirschmann iScout IFLEX 2 Manuals
PAT Hirschmann iVisor Maestro Manuals
PAT Hirschmann iVISOR MK4E2
PAT Hirschmann PRS 40 EZ Manual
PAT Hirschmann PRS 80 EZ Manuals